KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  8-18-2009
Number of Hours:  3.25
Manual Reference:  6-x
Brief Description:  Horizontal to vertical stab fairing iterations

I was not happy with how the horizontal to vertical stab fairing terminated around the right leading edge of the horizontal stab so I cut off a section and then reglassed it. While the epoxy was curing I investigated why the foot well lights were not working. I found a D-sub pin not seated properly in the connector. With the pin properly inserted and locked in the connector everything worked fine so I reassembled the connector back shell. With the expoxy cured on the fairing I removed it, trimmed it and fitted it back in place. The fit is now to my liking.
' style=

Horizontal to vertical stab fairing right leading edge reglassed

Horizontal to vertical stab fairing right leading edge reglassed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.